The construction of the 220 kV Single Circuit (S/C) Kalisindh Bhawanimandi transmission line, spanning a distance of 35.0 kilometers, was a significant infrastructure project in the power sector, with an estimated budget of INR 6.55 Crore. This project aimed to enhance the electricity transmission capacity and reliability in the region, ultimately benefiting the residents and industries.
The scope of work for this project included the installation of high-voltage transmission towers, conductors, insulators, and associated electrical equipment. Skilled engineers and laborers worked diligently to ensure that the transmission line was constructed to the highest safety and quality standards.
One of the key objectives of this project was to reduce transmission losses and voltage drops, thereby improving the overall efficiency of electricity distribution. Additionally, it aimed to strengthen the power grid's resilience to adverse weather conditions and load fluctuations, reducing the risk of blackouts.
The successful completion of the 220 kV S/C Kalisindh Bhawanimandi transmission line was a crucial milestone in enhancing the region's power infrastructure. It contributed to reliable electricity supply, supported economic growth, and met the increasing energy demands of the area. This investment in the power sector played a pivotal role in fostering development and prosperity.